Plans dependant on cash....
1. Replace lower engine mounts
2. Replace sub-frame (already organised replacement)
3. Replace front suspension bushes
4. Replace rear suspension bushes
5. Polish and/or chrome plate and install 65mm throttle body and matching intake manifold (already have)
6. Complete CAI and intake pipe
7. Re-foam drivers seat
8. Wire up relay for fogs
9. Strip and repair passenger side mirror (doesn't fold back in)
10. Wire in relays for auto folding mirrors (copying Vectose)
11. Replace all wheel bearings
12. Maybe install dual batteries (already got a matching pair from work)
....and much much moar, it's the way of the FTO
