Re: I have some news...
Posted: Fri Apr 10, 2015 12:11 am
by PHIL069
Re: I have some news...
Posted: Fri Apr 10, 2015 11:27 pm
by BorepYano
1. will you be building a rally track around the house?
2. when is the inaugural FTOA rally meet?
3. where is the closest car wash place between there and QLD?
Re: I have some news...
Posted: Sat Apr 11, 2015 12:13 am
by PHIL069
BorepYano wrote:1. will you be building a rally track around the house?
2. when is the inaugural FTOA rally meet?
3. where is the closest car wash place between there and QLD?
1. No, but maybe a quad bike track and a RC track and a RC helipad
2. If by "rally" you mean piss up, then next year
3. You bring the bucket and I will supply the water

Re: I have some news...
Posted: Sat Apr 11, 2015 6:57 pm
by PHIL069
Re: I have some news...
Posted: Mon Apr 13, 2015 8:28 pm
by Technikhaus
Nice work!
Now, hurry up and build a house/shed!
Re: I have some news...
Posted: Tue Apr 14, 2015 11:41 am
by ObsidianRadio
inb4 bonfire at Phil's place next year

Re: I have some news...
Posted: Tue Apr 14, 2015 9:16 pm
by destinationtoby
Are you going to grow some wheat or something in those paddocks?
Re: I have some news...
Posted: Tue Apr 14, 2015 11:22 pm
by ObsidianRadio
destinationtoby wrote:Are you going to grow some wheat or something in those paddocks?
"wheat"
Re: I have some news...
Posted: Wed Apr 15, 2015 8:35 pm
by destinationtoby
Or cotton

don't know wtf else would grow well out there
Re: I have some news...
Posted: Thu Apr 16, 2015 2:34 am
by bjk
ObsidianRadio wrote:destinationtoby wrote:Are you going to grow some wheat or something in those paddocks?
"wheat"
Wheat
Whead
Wheed
Weed
Profit
Re: I have some news...
Posted: Fri Apr 17, 2015 7:03 pm
by PHIL069
destinationtoby wrote:Are you going to grow some wheat or something in those paddocks?
I only own 1 "paddock", 2.5 acres, so no I won't be growing any wheat

Re: I have some news...
Posted: Fri Apr 17, 2015 7:36 pm
by PHIL069
A picture free update...
The land has been visited by the surveyors and they have done the soil tests and the contour report.
The soil is good to go, no further costs to excavations
The contour report shows that a 750mm cut has to be done to make a level pad for the house.
We had already been quoted $1500 for up to a 500mm cut and a stone pad layed, so it will cost us extra.
We were given 2 choices.
1. Cut 750mm and put stone pad down on virgin earth = $1500 + $1800extra = $3300
2. Cut 350mm from the rear of the area and put the dirt to the front. But this will then require concrete piers under the front of the house = $1500 + $5000 extra = $6500
We opted for option 1.
We have also been informed that we have to have 2 extra windows in the north facing wall of the house to meet "Energy Efficiency", this is going to cost an extra $1000.
Re: I have some news...
Posted: Sat Apr 18, 2015 8:45 am
by destinationtoby

$5000 for piers, how many do you Need? Do them yourself it's easy & cheap.
Re: I have some news...
Posted: Sat Apr 18, 2015 11:09 am
by PHIL069
destinationtoby wrote:
$5000 for piers, how many do you Need? Do them yourself it's easy & cheap.
The $5000 would be for the design and construction of the piers.
I couldn't do it myself as they have to do it all so I get my 20 year structual warranty.
Anyway we are going for the option without piers for an extra $1800.
Re: I have some news...
Posted: Sun May 24, 2015 3:11 pm
by PHIL069
Time for an update...
We have signed the "contract to build", house construction totals $143,000 so far.
We have accumulated all our other quotes incl.
- 12m x 7.6m x 3m colourbond shed, supplied and constructed on concrete footings $14,000
- Earthworks and pad for shed $1,500
- Concrete slab for shed $6,650
- Plumbing, connection from water meter to house (110m) + 3000l septic tank + 90m2 soakage area + 2 x 5000l water tanks (incl all earth works) $12,000
- Electrical, connection of three phase from power pole to house (110m) + connection of three phase from house to shed (incl power points and lights) + 7.1kW split AC to main living + 2.5kW split AC to master bed $11,500
- Carpet to bedrooms and office $3,750
Build total = $194,000
Land = $65,000
Total = $259,000
The bank pre approved us for $230,000, so we are hoping they will go for the full amount. If not we will have to lose some of the stuff.
We have signed the loan application, now we wait to hear some news.
We took the FTO up to the land today and what a difference a change of season brings.
Pics...
Notes...
These pics were taken with my phone, not my DLSR...Sorry.
You will notice the stakes we have placed for the position of the house and shed.

Re: I have some news...
Posted: Sun May 24, 2015 4:21 pm
by PHIL069
PHIL069 wrote:The contour report shows that a 750mm cut has to be done to make a level pad for the house.
We had already been quoted $1500 for up to a 500mm cut and a stone pad layed, so it will cost us extra.
We were given 2 choices.
1. Cut 750mm and put stone pad down on virgin earth = $1500 + $1800extra = $3300
2. Cut 350mm from the rear of the area and put the dirt to the front. But this will then require concrete piers under the front of the house = $1500 + $5000 extra = $6500
We opted for option 1.
Through confusion, I was informed incorrectly, the earth works will increase from $1500 to $1800 total.
Re: I have some news...
Posted: Sun May 24, 2015 7:15 pm
by kiz
Your front area is starting to look good. Better than the plowed red dirt you had last time I saw it

Re: I have some news...
Posted: Sun May 24, 2015 8:56 pm
by destinationtoby
So flat. Does it ever flood?
Re: I have some news...
Posted: Sun May 24, 2015 9:32 pm
by PHIL069
destinationtoby wrote:So flat. Does it ever flood?
It's not flat at all, it slopes down from the back to the front.
Plus we are up a lot higher than sea level, thus we have a great view down to the gulf.
No flooding.
Re: I have some news...
Posted: Mon May 25, 2015 7:53 am
by Technikhaus
Nice, hope they approve the loan!