He's waiting on lots of little sh*tty parts arriving - AN fittings for the turbo, silicone hoses etc.
Turbo cover has arrived and is on.
He's wrapped most of the up pipe.
Most of the IC pipework is done.
Sump is tapped for the return and has a fitting in ready for the braided hose (waiting on).
BOV was a pita to fit due to the circlip and us having circlip pliers which were too small, on a sunday, after everywhere had shut.
Got a Walbro 255lph pump to fit when that arrives (got one for mine at the same time too) which i'm not looking forward to fitting based on the last one I did, hoping that was a one-off and this will be easier.
Still not convinced about his up pipe location, think it's way to close to the stepper motor and will melt it but we'll see. If that goes pear shaped might have to remove the stepper and make something up to blank it off.
Other than that all good
